Australian
and US Elecosoft Powerproject construction template.
An Australian Asta Powerproject Version 14 template
which has been edited to suit Australian and US
conditions is available and may be downloaded
by clicking here>>> Australian
and US Asta Poweproject Version 14 construction
template.
An Australian Asta Powerproject Version 15 template
which has been edited to suit Australian and US
conditions is available and may be downloaded
by clicking here>>> Australian
and US Asta Poweproject Version 15 construction
template.
You should download and save into your Asta Powerproject
Template directory. This templates has a number
of the issues with the UK templates resolved,
including the default currency and calendars holidays.
|
| |
Eastwood
Harris Elecosoft Powerproject Quick Access Toolbar.
The Eastwood Harris Asta Powerproject Version
14 Quick Access Toolbar has been created to make
using Asta Powerproject simpler and may be downloaded
by clicking here>>> Australian
Asta Power Project Version 14 Quick Access Toolbar.
The Eastwood Harris Powerproject Version 1 Quick
Access Toolbar has been created to make using
Asta Powerproject simpler and may be downloaded
by clicking here>>> Australian
Asta Power Project Version 15 Quick Access Toolbar.
You should download this file, unzip it by double
clicking on it and dragging the XML file to your
desktop. Then import into Asta by right clicking
on your Asta Quick Access toolbar and selecting
Customise..., Ribbon,
Import/Export.
|
| |
Primavera
P6 Version 18 Layout.
If you want to save a lot of time formatting your
own P6 Layout then you may wish to download the
primavera .com.au layout by clicking here>>>
www.primavera.com.au_Layout.
The bars have been sorted out and minor changes
have been made to the Page Setup so the header displays
project information such as dates, project name
and page numbers are seen on every page and the
footer only contains information required on the
first page such as the Gantt Chart legend and Revision
Box. |
|
Eastwood
Harris recommended Microsoft Project 2010, 2013,
2016 and 2019 Quick Access Toolbar>>>
The Microsoft Project Ribbon does not group functions
by scheduling function and the Quick Access Toolbar
has very few commands which tend to make the software
difficult to navigate around.
It is recommended that the Quick Access Toolbar
is displayed below the Ribbon and the Ribbon is
hidden by right clicking in the Toolbar area.
This Microsoft Project 2010, 2013 & 2016 toolbar
may be downloaded and imported into MSP 2010.It
displays all the commonly used Microsoft Project
functions in a logical order.
Down load the file and unzip by right clicking on
the file and then import this with the the File,
Options, Quick Access Toolbar tab.
If you do not like the settings you may further
edit it in the File, Options, Quick Access Toolbar
tab or reset the toolbar using the Reset button.
|
|
Eastwood
Harris recommended Microsoft Project 2010, 2013,
2016 and 2019 Template Version 1>>>
The Microsoft Project 2013, 2016 and 2019 Global.mpt
sets the defaults for all new projects that are
created using the File, New command. There are
a number of issues with these options which are
explained in the author's books. This Microsoft
Project 2013, 2016 and 2019 *.mpp file has been
set up to reflect how the author normally sets
up projects and should be opened and saved as
a Microsoft Project template *.mpt file..
The following attributes have been changed from
the standard settings:
- File, Options, Schedule and Advanced have been
edited in line with the Author's recommendations
in his book.
- A new View titled "Gantt Chart Inc Negative
and Total Float":
- Columns: Total Float added and Resources removed.
- Grid lines: Middle and Bottom Timescale Tiers,
Project Start, Project Finish and Status Date
displayed and Current Date removed.
- Bars: Total Float (Total Slack) and Negative
Float added and all text removed from all bars.
- When any task is made Manually Scheduled
it will be displayed as a turquoise coloured
bar. This was achieved by moving the Critical
bar to the top of the list in the Bars form and
creating a bar to display Critical Manually Scheduled
bar.
- Bar display in the Legend: Many bars have been
hidden in the Legend (but not deleted) by placing
an "*" at the front of the Bar description
in the Bars form.
- Printing: some project information is drawn
from the Advanced Properties form. Also all project
data has been removed from the Legend so the Legend
may be hidden if not required, thus leaving all
project data displayed if the Legend is hidden.
- A Custom Field has been added to the "Tracking
Table" titled "Status Check" indicates
when activities have been updated correctly.
NOTES ON HOW TO CREATE A MICROSOFT PROJECT
TEMPLATE:
1. Create or select a directory to save
your Microsoft Project templates in Windows Explorer.
2. Select File, Options to open the Project Options
form.
3. Select the Save tab and set the directory that
your Microsoft Project Templates will be saved
in:
4. Download the Microsoft Project 2013, 2016 and
2019 template from www.eh.com.au - Software Downloads
page.
5. Unzip it by double clicking on the zip file
and dragging the file to your desktop.
6. Open the file with Microsoft Project.
7. Select File, Save As, Computer and Browse,
then, select from the drop down box to save as
type Microsoft Project template (*.mpt). Microsoft
will default to the directory you have selected
as a Template directory, so save the file in the
Template Directory.
8. Select the defaults at the Save As Template
form and click Save.
9. Close the Eastwood Harris template file and
any other projects that may be open.
10. Selct File, New, Personal Tab and you should
see the Microsoft Project Template you have just
created.
NOTES ON STATUS CHECK COLUMN:
1. You must set the "Status Date" in
the "Project Information" form for this
field to calculate correctly.
2. The Summary Task comments should be ignored.
3. You may down load the file by clicking on the
heading above and unzip by right clicking on the
file.
4. If you do not like the settings in your Global.mpt
you may edit them using Developer, Organizer to
copy settings from this file to your Global.mpt.
Click
here to download a sample MSP 2013, 2016 and 2019
file in zip format that shows how this field in
the Status Table operates >>>
|
|
Eastwood
Harris recommended Microsoft Project 2010 Template
Version 3 >>>
The Microsoft Project 2010 Global.mpt sets the
defaults for all new projects that are created
using the File, New command. There are a number
of issues with these options which are explained
in the author's books. This Microsoft Project
2010 file has been set up to reflect how the author
normally sets up projects.
The following attributes have been changed from
the standard settings:
- File, Options, Schedule and Advanced have been
edited in line with the Author's recommendations
in his book.
- A new View titled "Gantt Chart Inc Negative
and Total Float":
- Columns: Total Float added and Resources removed.
- Grid lines: Middle and Bottom Timescale Tiers,
Project Start, Project Finish and Status Date
displayed and Current Date removed.
- Bars: Total Float (Total Slack) and Negative
Float added and all text removed from all bars.
- Bar display in the Legend: Many bars have been
hidden in the Legend (but not deleted) by placing
an "*" at the front of the Bar description
in the Bars form.
- Printing: some project information is drawn
from the Advanced Properties form. Also all project
data has been removed from the Legend so the Legend
may be hidden if not required, thus leaving all
project data displayed if the Legend is hidden.
- A Custom Field has been added to the "Tracking
Table" titled "Status Check" indicates
when activities have been updated correctly.
- NOTE: You must set the "Status Date"
in the "Project Information" form for
this field to calculate correctly.
You may down load the file by clicking on the
heading above and unzip by right clicking on the
file.
If you do not like the settings in your Global.mpt
you may edit them using Developer, Organizer to
copy settings from this file to your Global.mpt.
Click
here to download aa sample MSP 2010 file in zip
format that shows how this field in the Status
Table operates >>>
|
|
Eastwood
Harris recommended Microsoft Project 2007 Template
>>>
The Microsoft Project 2007 Global.mpt sets the
defaults for all new projects that are created
using the File, New command. There are a number
of issues with these options which are explained
in the author's books. This Microsoft Project
2007 file has been set up to reflect how the author
normally sets up projects.
The following attributes have been changed from
the standard settings in the Gantt Chart View
including:
- The Tools, Options have been edited in line
with the Author's recommendations in his book.
- Columns: Total Float added and Resources removed.
- Grid lines: Middle and Bottom Timescale Tiers,
Project Start, Project Finish and Status Date
displayed and Current Date removed.
- Bars: Total Float (Total Slack) and Negative
Float added and all text removed from all bars
in an additional View.
- Bar display in the Legend: Many bars have been
hidden in the Legend (but not deleted) by placing
an "*" at the front of the Bar description
in the Bars form.
- Printing: some project information is drawn
from the File, Properties form. Also all project
data as been removed from the Legend so the Legend
may be hidden if not required, thus leaving all
project data displayed if the Legend is hidden.
You may down load the file by clicking on the
heading above and unzip by right clicking on the
file.
If you do not like the settings in your Global.mpt
you may edit them using Tools, Organizer to copy
settings from this file to your Global.mpt.
|
|
P3
Version 3.1 Service Pack 3 |
|
SureTrak
Version 3.0 Service Pack 3 (SureTrak Version 3c) |
|
Pervasive
ODBC drivers for SureTrak and P3 - for Windows 98
and earlier |
|
Primavera
Contractor 6.1 Hot Fix - resolves hidden header
and footers on printouts |
|
Primavera
P3 SDEF Converter |
|
Primavera
P6 V7 SDK xls files used to import data |